The relentless climb in construction costs, now up 37.5% over a six-year horizon, is creating a complex environment for lending and project feasibility in 2026. As the December quarter PPI shows costs accelerating—led by South Australia’s 2.4% jump—the “cost-to-complete” risk for new projects has moved back to the forefront of finance strategy.
From a finance perspective, these figures directly impact “valuation at completion” (VAC). When raw materials like terracotta and cement rise so sharply, the contract price for a new home can quickly deviate from the market value. This creates a “valuation gap” that can trap borrowers, requiring them to inject more equity or face higher interest rates due to increased LVRs.
At Infinite Finance, we prioritize:
- Project Feasibility Stress-Testing: We look at the 1.1% quarterly rise and ask: is the project still bankable if materials rise another 5% before lock-up?
- Lender Policy Navigation: Not all lenders treat construction cost blowouts the same. We focus on securing facilities that offer flexibility in the event of variations.
- Equity Protection: Given the 37.5% increase in build costs since 2019, many clients are sitting on massive equity in their established homes. We focus on leveraging that equity to secure safer, established assets rather than taking on the high-risk “unknowns” of the current construction market.
The 2026 finance landscape is defined by the “cost of delivery.” As energy prices continue to inflate the embedded cost of materials, the margin for error in new-build finance has narrowed. Having a strategy that prioritizes asset certainty over the volatility of the construction sector is essential for maintaining a resilient borrowing position.